Switchboard

Testing for MV/LV Switchboards

Detopsy Engineering Services provides professional testing for Medium Voltage (MV) and Low Voltage (LV) switchboards to ensure safety, reliability, and efficient power distribution. Our testing services help identify faults early, prevent equipment failure, and confirm that switchboards operate according to required electrical standards.

END-TO-END

Our MV/LV Switchboard Testing Services Include

we help clients transition to clean energy with confidence.

Visual Inspection & Verification

  • Inspection of panel components, wiring, busbars, and connections.

  • Verification of labeling, ratings, and installation integrity.

  • Checking for overheating signs, loose terminals, and physical damage.

Electrical Testing & Measurements

  • Insulation Resistance (IR) testing.

  • Continuity testing for busbars and protective conductors.

  • Contact resistance testing (where applicable).

  • Phase sequence and polarity checks.

Protection & Functional Testing

  • Circuit breaker operation tests (open/close/trip).

  • Relay testing and protection settings verification.

  • Interlock and safety mechanism testing.

  • Metering and control circuit functionality checks.

Commissioning & Reporting:

  • Final commissioning support to ensure readiness for energizing.

  • Test documentation, results reporting, and recommendations.

  • Handover support for client and project compliance.

Installation, Testing & Commissioning

  • Professional installation following industry standards and safety practices.

  • Testing and commissioning to ensure system efficiency and reliability.

  • Post-installation support and maintenance services.

Why Choose Detopsy Engineering Services for MV/LV Switchboard Testing Services ?

  • Safety Assurance: Reduces risk of electrical faults and hazards.

  • Reliability: Ensures stable and efficient power distribution.

  • Professional Testing: Accurate results with standard procedures.

  • Compliance: Helps meet required electrical and operational standards.

The process is easy!

1

Site Inspection & Switchboard Assessment

We inspect the MV/LV switchboard, verify connections, and confirm testing requirements.

2

Electrical & Functional Testing

Our team performs insulation, continuity, breaker operation, and protection relay tests.

3

Reporting & Commissioning Support

We provide test results, recommendations, and support safe energizing/commissioning.